Yokefellow
Contact

YES, markets & operations

An economic layer for participation—not the entire platform.

YES is the Yokefellow Empowerment Shekel. The economic design connects participation and exchange while recognizing that the infrastructure must pay for its own operation.

This reference describes the intended capability model, including authorization and design considerations; individual integrations may require further engineering and review.

YES in the system

YES is intended for defined activity across Buckets, Apps, participation, and connected market experiences. It does not by itself represent equity, profit rights, or ownership of Yokefellow Inc.

The current issuance direction is a front-loaded annual schedule where the scheduled issuance decreases by 5% from one year to the next. Final public economic documentation must reconcile exact contractual totals, distribution rules, and launch timing. No public token-sale or liquidity promise is made here.

Markets, auctions, and NFTs

A market and Auction House can allow eligible token or NFT activity according to each item's permissions. Fee schedules, royalty snapshots, execution guarantees, and market integrity controls have to be explicit.

Not every functional NFT should be tradable. Tickets, earned badges, materials, identity keys, and equipment may have very different rules.

Who funds the rails?

The proposed operating model combines usage fees charged to Bucket operators with marketplace or auction transaction fees. The chain's gas cost exists independently. A shared prepaid USDC balance may cover operations for multiple Buckets owned by one wallet while their usage remains separately accounted for.

Sustainable pricing requires measuring gas per action, hosting and indexing costs, abuse exposure, service-support costs, and the transaction volume needed to cover overhead. This work is a prerequisite to setting final public operator rates.

What is not yet promised

No guaranteed YES price, listing, earning rate, investment return, or fixed third-party operator yield. The public launch sequence is subject to technical, economic, operational, and legal review.